您还有0次抽奖机会
锤子
Preparation 1)Place the unit on the flat table. 2)Take off nut and cassette. 3)Making sure the back nozzle of bath is closed, put the water in the bath. Do not put in water too much. 4)Turn a power switch off and plug in.(AC100V.2A)
打开失败或需在电脑查看,请在电脑上的资料中心栏目,点击"我的下载"。建议使用手机自带浏览器。